Posted 3:20 PM 10/15/2012 : Florida Blvd. construction begins
BATON ROUGE - The Department of Transportation and Development is working to repave a bumpy patch of Florida Blvd.
The 2.6 mile stretch is from N. Foster Dr. to Airline Highway. Prep work has begun in the intersection of N. Foster Dr. and by the Airline Highway ramps.
DOTD will be... Read More